New code of estimating practice
The Code of Estimating Practice was originally published by the Chartered Institute of Building (CIOB) in 1996. It went on to become a highly-respected industry resource, providing an authoritative guide to the principles of, and good practice in, estimating for building work for those involved in procuring and pricing construction works, both in the public and private sectors.
It presents estimating as part of the wider process of commercial management for construction businesses. This is not simply a matter of winning a bid - if the bid is successful, the estimate goes on to form the basis of the contractor’s budget and cost management strategy.
The seventh edition was published in 2009 and included new material on estimating strategy, tendering, procedures and best practice, as well as the build-up of unit rates of cost, overheads and profit, and e-commerce.
In March 2018, it was re-branded as the New Code of Estimating Practice. https://www.wiley.com/en-gb/New+Code+of+Estimating+Practice-p-9781119329640
This new version has been completely rewritten to include more contextual and educational material, and now covers:
- Estimating practice.
- The bidding process.
- The fundamentals in formulating a bid.
- The pre-qualification process.
- Procurement options.
- Contractual arrangements and legal issues.
- Preliminaries.
- Temporary works.
- Cost estimating techniques.
- Risk management.
- Logistics.
- Resource and production planning.
- Computer-aided estimating.
- Information and time planning.
- Resource planning and pricing.
- Preparation of an estimator’s report.
- Bid assembly and adjudication.
- Pre-production planning and processes.
- Site production.
--CIOB
[edit] Related articles on Designing Buildings Wiki
- Approximate quantities cost plan.
- Bills of quantities.
- Budget.
- Chartered Institute of Building.
- All-in rates.
- Contract sum analysis.
- Contract sum.
- Cost consultant.
- Cost control.
- Cost engineering.
- Cost plans for construction projects.
- Elemental cost plan
- Final account.
- Initial cost appraisals.
- Mark-up.
- Measurement.
- New Rules of Measurement.
- Pre-tender estimate.
- Procurement.
- Project overheads.
- Tender documents.
- Top down and bottom up estimating.
Featured articles and news
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.
ECA shares advice for those who may be exposed to risks.
How to revolutionise UK housing with MMC
CIC and Supply Chain Sustainability School unveil a plan.
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
New Floods Resilience Taskforce
With a wet met office autumn prediction.